Current through Register Vol. 35, No. 23, December 10, 2024
Section 17.9.588.12 - APPLICATION REQUIREMENTS FOR TYPE 2 PROJECTS Applications for type 2 pre-construction design projects shall describe a scope of work that includes:
A. a deliverables-based summary of the plan for the design project, including proposed operational goals for the project;B. the proposed site with maps, diagrams or images;C. plans for achieving compliance with federal, state and local construction requirements; andD. plan to obtaining funding to complete project construction and installation.N.M. Admin. Code § 17.9.588.12
Adopted by New Mexico Register, Volume XXXIV, Issue 07, April 11, 2023, eff. 4/11/2023