N.M. Admin. Code § 17.7.4.15

Current through Register Vol. 35, No. 23, December 10, 2024
Section 17.7.4.15 - COMMISSION REVIEW, ACCEPTANCE AND ACTION
A. Compliance Review. The commission will review the utility's proposed IRP for compliance with the procedures and objectives set forth herein. The commission may accept the proposed IRP as compliant with this rule without a hearing, unless a protest is filed that demonstrates to the commission's reasonable satisfaction that a hearing is necessary. Protests must be filed within thirty (30) days of the filing of the proposed IRP. If the commission has not acted within forty-five (45) days after the filing of the proposed IRP, that IRP is deemed accepted as compliant with this rule. If the commission determines the proposed IRP does not comply with the requirements of this rule, the commission will identify the deficiencies and return it to the utility with instructions for re-filing.
B. Use in Resource Acquisition Proceedings. In a proceeding concerning a utility's request for a CCN for a new utility resource, or in other proceedings concerning a utility's resource acquisition, the utility shall present evidence that the requested resource is consistent with the commission-accepted utility IRP unless material changes, as described in Section 17.7.4.14 of this rule, have occurred that would warrant a different utility course of action. Evidence that the resource is consistent with the IRP, and that there have not been material changes that would warrant a different course of action by the utility, will constitute prima facie evidence that the resource-type, but not the particular resource being proposed, is required by the public convenience and necessity.

N.M. Admin. Code § 17.7.4.15

17.7.4.15 NMAC - N, 4-16-07