The utility shall promptly notify the commission and participants of material events that would have the effect of changing the results of the utility's IRP had those events been recognized when the IRP was developed.
N.M. Admin. Code § 17.7.4.14
The utility shall promptly notify the commission and participants of material events that would have the effect of changing the results of the utility's IRP had those events been recognized when the IRP was developed.
N.M. Admin. Code § 17.7.4.14