See this Chapter of the IECC except as provided below.
Exception: Parking facilities, serving occupancies other than R-2 with fewer than 10 automobile parking spaces.
TABLE C405.13.1 REQUIRED EV POWER TRANSFER INFRASTRUCTURE
Occupancy | EVSE Spaces | *EV Capable Spaces |
Group A | 5% | 10% |
Group B | 5% | 5% |
Group E | 5% | 5% |
Group F | 2% | 5% |
Group H | 1% | 0% |
Group I | 5% | 10% |
Group M | 5% | 10% |
Group R-1 | 5% | 15% |
Group R-2 | 5% | 15% |
Group R-3 and R-4 | 2% | 5% |
Group S exclusive of Parking Garages | 1% | 0% |
Group S-2 Parking Garages | 5% | 10% |
*EVCapable Spaces are in addition to the required EVSE Spaces.
Exceptions: The following systems are exempt:
FIGURE C408.2.4
COMMISSIONING COMPLIANCE CHECKLIST
Project Information: ________________________________ Project Name:__________________________
Project Address: _________________________________________________________________________
Commissioning Authority: __________________________________________________________________
Commissioning Plan (Section C408.2.1)
[] Commissioning Plan was used during construction and includes all items required by Section C408.2.1
[] Systems Adjusting and Balancing shall be completed per plans and specifications.
[] HVAC Equipment Functional Testing shall be completed per plans and specifications.
[] HVAC Controls Functional Testing shall be completed per plans and specifications.
[] Economizer Functional Testing shall be completed per plans and specifications.
[] Lighting Controls Functional Testing shall be completed per plans and specifications.
[] Service Water Heating System Functional Testing shall be completed per plans and specifications.
[] Manual, record documents and training shall be completed per plans and specifications.
[] Preliminary Commissioning Report shall be submitted to the owner and includes all items required by Section C408.2.4.
[] The above-referenced items are scheduled to be provided on:
I, the commissioning provider, do hereby certify that I am providing the owner or owner's representative with documentation as to the mechanical, service water heating and lighting systems commissioning in accordance with the 2021 IECC.
_____________________________________________ ____________________
Signature of Commissioning Provider Date
____________________________________________ ____________________
Signature of Building Owner/Owner's Representative Date
_____________________________________________________________________________
N.M. Admin. Code § 14.7.9.12