Description | Unit of Measure | |||
1. | Test Pits | Cubic Yard | ||
2. | Stone Foundation (bedding) | Cubic Yard | ||
3. | Select Material (below and above pipe grade) | Cubic Yard | ||
4. | Rock Excavation (including removal and disposal | Cubic Yard | ||
of boulders) | ||||
5. | Wood Sheeting (install and remove where shown | Square Feet or1000 | ||
on plans) | Board Feet | |||
6. | Wood Sheeting (left in place where shown on | Square Feet or1000 | ||
plans) | Board Feet | |||
7. | Steel Sheeting (install and remove where shown | Square Feet orTons | ||
on plans) | ||||
8. | Steel Sheeting (left in place where shown on | Square Feet orTons | ||
plans) | ||||
9. | Permanent Pavement Gravel | Square Yard | ||
10. | Pavement | |||
i. | Municipal: | |||
(1) | Temporary which shall be removed | Square Yard | ||
(where applicable) | ||||
(2) | Base | Square Yard | ||
(3) | Top | Square Yard | ||
ii. | County: | |||
(1) | Temporary which shall be removed | Square Yard | ||
(where applicable) | ||||
(2) | Base | Square Yard | ||
(3) | Top | Square Yard | ||
iii. | State: | |||
(1) | Temporary which shall be removed | Square Yard | ||
(where applicable) | ||||
(2) | Base | Square Yard | ||
(3) | Top | Square Yard | ||
11. | Testing | Linear Feet | ||
12. | Concrete Cradle or Encasement (to be identified | Cubic Yard | ||
where applicable) |
N.J. Admin. Code § 7:14-2.10