Current through Register Vol. 56, No. 24, December 18, 2024
Section 7:11-3.19 - Meter(a) The user shall purchase or construct, install, maintain and operate, at his own sole cost and expense, in a manner satisfactory to the New Jersey Water Supply Authority, a flow meter or measuring device of a type and in a location approved by the New Jersey Water Supply Authority.(b) The user shall have the flow meter tested for accuracy at the user's own sole cost and expense before installation, by a meter testing firm, and shall furnish a report of such test to the New Jersey Water Supply Authority. The user further shall have such laboratory test repeated and furnish a report of said test to the New Jersey Water Supply Authority at intervals of not less than one year and following meter repairs.(c) Meter tests other than those set forth in (b) above may be required by the New Jersey Water Supply Authority, and payment therefor shall be at the cost and expense of the user except when report of such tests shall disclose the meter to be registering within five percent of true accuracy, in which case the cost of such test shall be paid by the New Jersey Water Supply Authority.(d) In the case of a joint allocation to be operated through a single agent designated as the user, there shall be provided by the user, in addition to the meter at the point of withdrawal, meters to measure the distribution to each of the several parties to the allocation.N.J. Admin. Code § 7:11-3.19
Amended by R.2009 d.114, effective 4/6/2009.
See: 40 N.J.R. 5903(a), 41 N.J.R. 1403(a).
In (b), substituted "the user's" for "his".