N.J. Admin. Code § 7:11-3.18

Current through Register Vol. 56, No. 24, December 18, 2024
Section 7:11-3.18 - Withdrawal systems
(a) Withdrawal of raw water from Raritan Basin by the user shall be at his own cost and expense.
(b) The New Jersey Water Supply Authority grants to the user of water from the Delaware and Raritan Canal the right to install and construct in the Canal and on adjoining Canal property at or near the point of withdrawal, and to replace, repair, operate and maintain, such apparatus, equipment, structures and facilities, all at the user's sole cost and expense, as may be necessary for withdrawal from the Canal of the raw water sold by the New Jersey Water Supply Authority, for the measurement thereof, and for the transportation thereof to the plant or plants of the user, provided that plans for the construction of such facilities have received the prior written approval of the Department and the Delaware and Raritan Canal Commission.
(c) Prior to the installation or construction of any apparatus, equipment, structures or facilities therefor, the user shall furnish to the New Jersey Water Supply Authority for its prior written approval, a plan showing in such detail as may be required by the New Jersey Water Supply Authority the proposed system for withdrawal, measurement, transportation and ultimate disposition of the water, and shall not install or construct the same until said system shall have been approved in writing by the New Jersey Water Supply Authority, and if applicable the Department and the Delaware and Raritan Canal Commission.
(d) The New Jersey Water Supply Authority also grants to the user of water from the Delaware and Raritan Canal the right of ingress over, upon and under any and all other Canal lands as may be necessary for the construction, operation, repair and maintenance of such system, after the user has received the written approval if applicable of the Department and the Delaware and Raritan Canal Commission.
(e) The New Jersey Water Supply Authority or its designated representative shall have the right at any time to examine and inspect all facilities constituting the withdrawal system.
(f) The user of water from the Delaware and Raritan Canal shall, within ten days after receipt of written demand from the New Jersey Water Supply Authority, make such repairs to its structures and facilities as, in the opinion of the New Jersey Water Supply Authority, may be required to eliminate leakage of water from, or potential damage to the Delaware and Raritan Canal.
(g) Failure of any user of water from the Delaware and Raritan Canal to make any repairs required by the New Jersey Water Supply Authority pursuant to (f) above shall allow the New Jersey Water Supply Authority to make any necessary repairs at the cost and expense of the user and the user shall pay any such repair costs to the New Jersey Water Supply Authority upon demand.
(h) The user shall make such changes in its withdrawal system as may from time to time be ordered in writing by the New Jersey Water Supply Authority.
(i) The user shall make no alterations in the approved withdrawal system without securing the prior written approval of the New Jersey Water Supply Authority.

N.J. Admin. Code § 7:11-3.18

Amended by R.2003 d.410, effective 10/20/2003.
See: 35 New Jersey Register 2004(a), 35 New Jersey Register 4876(a).