An architect shall retain a copy of any contract entered into with a contractor in connection with a design build project for 10 years from the date of the contract.
N.J. Admin. Code § 13:27-7A.6
An architect shall retain a copy of any contract entered into with a contractor in connection with a design build project for 10 years from the date of the contract.
N.J. Admin. Code § 13:27-7A.6