Where an architect has knowledge that an owner has accepted and is relying upon any design or construction documents prepared by the architect, and where the architect is requested or directed by any party to make fundamental changes in those design or construction documents, the architect shall give immediate written notice of the proposed change(s) to the owner and to the contractor. The architect shall not proceed with the changes unless the owner or developer and the contractor agree to the changes in the signed writings.
N.J. Admin. Code § 13:27-7A.5