When a utility is notified by ISO-NE that it must assume the load obligation of a CEPS, customer authorization to transfer service pursuant to 311.01 shall not be required.
N.H. Admin. Code § Puc 311.02
When a utility is notified by ISO-NE that it must assume the load obligation of a CEPS, customer authorization to transfer service pursuant to 311.01 shall not be required.
N.H. Admin. Code § Puc 311.02