N.H. Admin. Code § Puc 311.02

Current through Register No. 45, November 7, 2024
Section Puc 311.02 - Obligations

When a utility is notified by ISO-NE that it must assume the load obligation of a CEPS, customer authorization to transfer service pursuant to 311.01 shall not be required.

N.H. Admin. Code § Puc 311.02

Amended byVolume XXXIV Number 24, Filed June 12, 2014, Proposed by #10603, Effective 5/21/2014, Expires5/21/2024 .