Current through Register No. 45, November 7, 2024
Section Env-Wt 603.06 - Project Design Narrative RequiredThe applicant shall provide a project design narrative that includes the following:
(a) A discussion of how the proposed project:(1) Uses best management practices and standard conditions in Env-Wt 307; (2) Meets all avoidance and minimization requirements in Env-Wt 311.07 and Env-Wt 313.03;(3) Meets approval criteria in Env-Wt 313.01;(4) Meets evaluation criteria in Env-Wt 313.01(c);(5) Meets CFA requirements in Env-Wt 603.04; and(6) Considers sea-level rise and potential flooding evaluated pursuant to Env-Wt 603.05;(b) A construction sequence, erosion/siltation control methods to be used, and a dewatering plan; and(c) A discussion of how the completed project will be maintained and managed.N.H. Admin. Code § Env-Wt 603.06
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12806, Effective 12/15/2019, Expires 12/15/2029.