Current through Register No. 50, December 12, 2024
Section Env-Or 703.12 - Permit Renewal(a) If the permittee wishes to continue to operate a facility that is subject to a groundwater release detection permit beyond the 5-year permit term, the permittee shall submit the information specified in (d), below, to the department prior to the expiration of the permit but not more than 90 days prior to expiration.(b) If the renewal application is submitted prior to the expiration of the permit, the permittee may continue to operate under the terms of the permit until a final decision on the renewal application has been made, even if that is after the expiration date.(c) If the renewal application is not submitted prior to the expiration of the permit, the permittee shall discontinue active operation of the facility as of the expiration date but otherwise continue to comply with all conditions in the permit for which renewal is sought until: (1) The permit is renewed; or(2) The facility is closed in accordance with all applicable requirements.(d) The renewal application shall be on a form obtained from the department that: (1) Includes an update of all information required by Env-Or 703.02(a) with all planned modifications included; and(2) Has been signed as specified in Env-Or 703.08.(e) The renewal application shall be dated, signed, and sealed by the professional of record.N.H. Admin. Code § Env-Or 703.12
(See Revision Note at chapter heading for Env-Or 700) #8812, eff 2-1-07
Amended by Volume XXXV Number 23, Filed June 11, 2015 , Proposed by #10832, Effective 6/1/2015, Expires6/1/2025.