Current through Register No. 50, December 12, 2024
Section Env-Or 703.11 - Permittee Obligations Upon Permit Issuance(a) Acceptance of the permit by the applicant shall constitute permission for the department to enter the permitted facility for the purpose of collecting information, examining records, collecting samples, and taking other actions needed to ensure compliance with the permit.(b) Prior to commencing operations, the permittee shall submit to the department: (1) An as-built site plan on an 8-1/2 inch x 11 inch or 11 inch x 17 inch sheet, together with boring logs and well construction details; and(2) The results of 2 complete rounds of water quality testing.N.H. Admin. Code § Env-Or 703.11
(See Revision Note at chapter heading for Env-Or 700) #8812, eff 2-1-07
Amended by Volume XXXV Number 23, Filed June 11, 2015 , Proposed by #10832, Effective 6/1/2015, Expires6/1/2025.