Current through Register No. 45, November 7, 2024
Section Env-A 2806.02 - Permit-By-Notification Procedures(a) To obtain a permit-by-notification, the owner or operator of a non-metallic mineral processing plant shall submit the information required by Env-A 2806.04 in writing to the department, together with the signature and certification specified in Env-A 2806.05 and the fee specified in Env-A 2806.06. The filing shall constitute a permit application for the plant.(b) The department shall issue a permit-by-notification for a non-metallic mineral processing plant if: (1) The applicant has submitted all required information and the required fee; and(2) The filing demonstrates that the plant will meet the applicable requirements of Env-A 2803, Env-A 2805, and Env-A 2806.(c) Within 10 days after initial startup of an affected facility, the owner or operator shall notify the department in writing by electronic means, U.S. Postal Service (USPS) mail, or private delivery service of the actual date of startup.N.H. Admin. Code § Env-A 2806.02
Amended by Volume XXXIX Number 02, Filed January 10, 2019, Proposed by #12693, Effective 12/22/2018, Expires 12/22/2028.