N.H. Admin. Code § Env-A 2806.01

Current through Register No. 50, December 12, 2024
Section Env-A 2806.01 - Permit-By-Notification Required

Prior to operating any non-metallic mineral processing plant, the owner or operator shall obtain:

(a) A standard permit, as specified in Env-A 600; or
(b) A permit-by-notification, as specified in this part.

N.H. Admin. Code § Env-A 2806.01

#9793, eff 10-1-10

Amended by Volume XXXIX Number 02, Filed January 10, 2019, Proposed by #12693, Effective 12/22/2018, Expires 12/22/2028.