Nev. Admin. Code § 704.Sec. 9.3

Current through November 8, 2024
Section 704.Sec. 9.3 - NEW

The Commission hereby identifies the following types of work and services as involving a gas pipeline facility and presenting an elevated risk to public safety:

1. New installation of district pressure regulator stations, compressor stations or gate stations.
2. Reconfiguration or physical facility changes, other than routine operating adjustments and like-kind replacements, performed at district pressure regulator stations, compressor stations or gate stations that alter or modify the configuration or overpressure protection of equipment.
3. Installation, uprating, repair by replacement or abandonment of transmission pipelines.
4. Installation, repair by replacement or abandonment of high-pressure distribution pipelines operating at 200 pound-force per square inch gauge and above and with a project length of 3,000 feet or greater of installed, replaced or abandoned distribution pipeline.
5. Installation of distribution mains where such distribution mains attach to existing bridges or other engineered structures, except for newly designed or constructed bridges where the pipeline installation design was approved by the public agency undertaking the design or construction of the bridge.
6. Uprating of distribution pipelines.
7. Installation of a peak shaving facility, including any modification or reconfiguration that would alter such a facility's pressure delivery characteristics.
8. Installation of new permanent in-line inspection launchers and receivers.

Nev. Admin. Code § 704.Sec. 9.3

Added to NAC by Pub. Service Comm'n, R073-21A, eff. 9/8/2022

section 3 of Assembly Bill No. 173, chapter 96, Statutes of Nevada 2021, at page 411 (NRS 703.1543)