Section 704.8785 - Requirements for reporting data: Information relating to design, operations and safety; efficiency of generation of powerA utility shall file with the Commission, in the format for a tariff, the requirements for:
1. The design, operations and safety related to cogeneration facilities and small power production facilities located within the utility's certificated area in this State; and2. The total efficiency of the generation of power for each cogeneration facility located within the utility's certificated area in this State.Nev. Admin. Code § 704.8785
Pub. Service Comm'n, Gen. Order 32 § 5.0, eff. 8-21-81-NAC A 3-27-92-Substituted in revision for NAC 704.720