Current through October 11, 2024
Section 445B.33656 - Operating permit to construct for approval of plantwide applicability limitation: Contents; noncompliance with conditions1. The Director shall cite the legal authority for each condition contained in a Class I operating permit to construct for the approval of a plantwide applicability limitation.2. A Class I operating permit to construct for the approval of a plantwide applicability limitation must contain the following conditions: (a) The expiration date of the Class I operating permit to construct must be determined in accordance with subsection 5 of NAC 445B.3366.(b) The holder of the Class I operating permit to construct shall retain records pursuant to 40 C.F.R. § 52.21(aa)(13).(c) Each of the conditions and requirements of the Class I operating permit to construct is severable, and if any is held invalid, the remaining conditions and requirements continue in effect.(d) The holder of the Class I operating permit to construct shall comply with all conditions of the Class I operating permit to construct. Any noncompliance constitutes a violation and is a ground for: (1) An action for noncompliance;(2) The revoking and reissuing, or the terminating, of the Class I operating permit to construct by the Director; or(3) The reopening or revising of the Class I operating permit to construct by the holder of the Class I operating permit to construct as directed by the Director.(e) The need to halt or reduce activity to maintain compliance with the conditions of the Class I operating permit to construct is not a defense to noncompliance with any condition of the Class I operating permit to construct.(f) The Director may revise, revoke and reissue, reopen and revise, or terminate the Class I operating permit to construct for cause.(g) The Class I operating permit to construct does not convey any property right or exclusive privilege.(h) The holder of the Class I operating permit to construct shall provide the Director, in writing and within a reasonable time, with any information that the Director requests to determine whether cause exists for revoking or terminating the Class I operating permit to construct, or to determine compliance with the conditions of the Class I operating permit to construct.(i) The holder of the Class I operating permit to construct shall allow the Director or any authorized representative of the Director, upon presentation of credentials, to: (1) Enter upon the premises of the holder of the Class I operating permit to construct where: (I) The stationary source is located;(II) Activity related to emissions is conducted; or(III) Records are kept pursuant to the conditions of the Class I operating permit to construct;(2) Have access to and copy, during normal business hours, any records that are kept pursuant to the conditions of the Class I operating permit to construct;(3) Inspect, at reasonable times, any facilities, practices, operations or equipment, including any equipment for monitoring or controlling air pollution, that are regulated or required pursuant to the Class I operating permit to construct; and(4) Sample or monitor, at reasonable times, substances or parameters to determine compliance with the conditions of the Class I operating permit to construct or applicable requirements.(j) A responsible official of the stationary source shall certify that, based on information and belief formed after a reasonable inquiry, the statements made in any document required to be submitted by any condition of the Class I operating permit to construct are true, accurate and complete.3. In addition to the requirements established in subsections 1 and 2, a Class I operating permit to construct for the approval of a plantwide applicability limitation must contain the information set forth in 40 C.F.R. § 52.21(aa)(7) as adopted by reference in NAC 445B.221.Nev. Admin. Code § 445B.33656
Added to NAC by Environmental Comm'n by R125-04, eff. 9-24-2004; A by R189-05, 5-4-2006; R139-06, 9-18-2006