Current through November 25, 2024
Section 408.337 - Itemized estimate of cost of relocation of facility: Contents1. The itemized estimate described in paragraph (f) of subsection 2 of NAC 408.327 must: (a) Include the estimated costs of: (2) Construction overhead;(9) Preliminary and construction engineering.(b) Separate and identify credits in detail, including credits for salvage, betterments and accrued depreciation.(c) Include the major components of materials.(d) Include the factors relating to construction overhead.(e) Include a statement of the utility's compensable interests upon which its claim for reimbursement is made.(f) Include a statement describing the method for continuing, preserving, relinquishing or extinguishing the occupancy rights of the utility.(g) Include a statement that any facility which is relocated or adjusted within the right-of-way must be relocated or adjusted pursuant to the provisions of NAC 408.010 to 408.557, inclusive.2. Unit costs, including average labor rates and broad gauge units of property, may be used to estimate the cost of relocation if the utility uses those rates or units in its operations and they represent direct costs and related indirect costs.Nev. Admin. Code § 408.337
Added to NAC by Dep't of Transportation, eff. 1-6-95