If a boiler or pressure vessel has not been properly prepared for inspection as defined in 229 NAC 6 and/or as requested by the Inspector, the Inspector shall decline to make such inspection until the item has been properly prepared.
229 Neb. Admin. Code, ch. 4, § 013