The applicant shall assure the Executive Director that all legal requirements have or can be met prior to the allocation of funds. Legal information may include the following as appropriate for the project, this list is not exclusive to other necessary information:

007.01 If the applicant is a governmental entity, citation(s) to the legal authorities relied upon by the applicant to undertake or participate in the project.
007.02 An explanation, with appropriate documentation of legal authorities, of the applicant's intention to finance that part of the project for which assistance from the fund is not requested.
007.03 A showing that the applicant has or can acquire any necessary land rights or water rights.
007.04 Copies of any available proposed or executed contracts or bids for construction or consultant services necessary for completion of the project which would help document the project's estimated costs.
007.05 A listing of any permits, licenses, or other approvals required for the project, their current status, and the estimated schedule for compliance.
007.06 An explanation of the applicant's plan to require consultants, contractors, and subcontractors to obtain liability insurance or bonding to ensure the proper design and construction of the project, as applicable.
007.07 An analysis of the applicant's potential liability for damages because of the project including failure of structural measures and an explanation of the applicant's plan to protect itself from any such liability.
007.08 Such other information, plans, and specifications as requested by the Executive Director or the Board and are reasonably necessary to confirm the applicant's authority.