"EPA" means the United States Environmental Protection Agency.
047.01 A continuous on-site, physical construction program has begun; or047.02 The owner or operator has entered into contractual obligations, which cannot be canceled or modified without substantial loss, for physical construction of the facility to be completed within a reasonable time.128 Neb. Admin. Code, ch. 1, § 047
Amended effective 7/6/2016.