Current through Register Vol. 23, December 6, 2024
Rule 17.50.1719 - POST-CLOSURE CARE AND MAINTENANCE(1) The owner or operator of a compost facility subject to the provisions of ARM Title 17, chapter 50, subchapter 13, shall conduct post-closure care and maintenance for two years, or a longer period as the department determines necessary to protect human health or the environment. During the post-closure care period, the owner or operator shall: (a) continue to monitor and sample ground water or surface water, if applicable; and(b) inspect and maintain any cover material or vegetation.Mont. Admin. r. 17.50.1719
NEW, 2017 MAR p. 285, Eff. 3/11/2017 AUTH: 75-10-204, MCA; IMP: 75-10-204, MCA