Current through December 10, 2024
Rule 19-8-1.29 - Plan Review - Alteration of Existing Equipment(1) A contractor must submit for review an application and plans for the alteration of existing equipment.(2) To apply for a plan review for the alteration of existing equipment, a contractor must: (a) submit a completed application on a department-approved form;(b) pay the fee required by this Regulation; and(c) submit a written description of the scope of work, which shall include a description of each alteration to be performed.(3) In addition to submitting the items under subsection (2), a contractor must submit layout drawings as specified in this Regulation for the specific type of equipment, if the alteration described in subsection (2)(c) results in one or more of the following changes: (a) the rated speed of the equipment in feet per minute(b) the rated capacity of the equipment in pounds;(c) the total travel of the equipment in feet and inches;(d) the classification of the equipment, such as passenger elevator to freight elevator or freight elevator to passenger elevator; or(e) the driving machine is re-located.Miss. Code Ann. §§ 45-45-13; 45-45-37 (Rev. 2015); 83-5-1 (Rev. 2011)