Current through December 10, 2024
Rule 19-8-1.28 - Plan Review - New Equipment(1) A contractor must submit for review an application and plans for the installation of new equipment.(2) To apply for a plan review for the installation of new equipment, a contractor must: (a) submit a completed application on a department-approved form;(b) pay the fee required by this Regulation; and(c) submit layout drawings as specified in this Regulation for the specific type of equipment to be installed. These layout drawings shall also include: (i) the rated speed of the equipment in feet per minute;(ii) the rated capacity of the equipment in pound;(iii) the total travel of the equipment in feet and inches;(iv) elevation drawings of the hoistway, runway, or wellway; and(v) plan drawings indicating the arrangement of the equipment in a machine room, machine space, control room, or control space.Miss. Code Ann. §§ 45-45-13; 45-45-37 (Rev. 2015); 83-5-1 (Rev. 2011)