19 Miss. Code. R. 8-1.28

Current through December 10, 2024
Rule 19-8-1.28 - Plan Review - New Equipment
(1) A contractor must submit for review an application and plans for the installation of new equipment.
(2) To apply for a plan review for the installation of new equipment, a contractor must:
(a) submit a completed application on a department-approved form;
(b) pay the fee required by this Regulation; and
(c) submit layout drawings as specified in this Regulation for the specific type of equipment to be installed. These layout drawings shall also include:
(i) the rated speed of the equipment in feet per minute;
(ii) the rated capacity of the equipment in pound;
(iii) the total travel of the equipment in feet and inches;
(iv) elevation drawings of the hoistway, runway, or wellway; and
(v) plan drawings indicating the arrangement of the equipment in a machine room, machine space, control room, or control space.

19 Miss. Code. R. 8-1.28

Miss. Code Ann. §§ 45-45-13; 45-45-37 (Rev. 2015); 83-5-1 (Rev. 2011)
Amended 1/10/2015
Amended 7/30/2015
Amended 9/2/2017
Amended 6/28/2019