19 Miss. Code. R. 8-1.17

Current through December 10, 2024
Rule 19-8-1.17 - Reporting Requirements - Building Owner
(1) To obtain a certificate of compliance, the building owner must submit to the department within sixty (60) days of the equipment inspection date, the following items:
(a) The application for certificate of compliance;
(b) Written documentation to verify that all violations of the applicable ASME Safety Codes or ASCE Standards as adopted in this Regulation;
(c) Any application(s) for delay or waiver if applicable; and
(d) All applicable fees.
(2) The owner shall notify the department, in writing and within thirty (30) days, of equipment that has been place out of service.
(3) The owner shall notify the department, in writing and within thirty (30) days, of an elevator that has had alterations converting the equipment to a material lift. The conversion shall comply with the applicable sections of this Regulation.
(4) The owner shall notify the department, in writing and within thirty (30) days, of a material lift that has had alterations converting the equipment to an elevator. The elevator must be inspected and brought into compliance with this Regulation as a new installation.
(5) When a delay has been approved, the owner shall notify the department, in writing within thirty (30) days of the date of correction.

19 Miss. Code. R. 8-1.17

Miss. Code Ann. §§ 45-45-13 (Rev. 2015); 83-5-1 (Rev. 2011)
Amended 1/10/2015
Amended 7/30/2015
Amended 9/2/2017
Amended 6/28/2019