Section 19-7-3.03.5.7 - VariationsA. No approved building system (or amendment thereto) shall be varied in any way without prior authorization by the approved design review agency. If such authorization is oral, it shall be confirmed in writing within ten (10) days.B. All approved variations shall be made a part of the written record of the approval of the building system.19 Miss. Code. R. 7-3.03.5.7
Miss. Code Ann. § 75-49-5 (Supp. 2013).