Current through December 10, 2024
Section 19-7-3.03.5.6 - Review and ApprovalA. The approved design review agency shall evaluate the building system and compliance assurance program documentation to determine compliance with the Standards defined herein. Such agency may require tests to determine whether a building system or compliance assurance program meets the Standards defined herein if that determination cannot be made from an evaluation of the plans, specifications, and documentation alone.B. The approved design review agency shall approve the manufacturer's building system and compliance assurance program when it determines that they meet the Standards as defined herein. Within thirty (30) days of approval, such agency shall forward to both the manufacturer and the Division a complete copy of the approved building system and compliance assurance program documentation and the building system approval report. Each transmittal to the Department of a set of approved documentation for a modular homes or component shall be accompanied by an administrative fee.19 Miss. Code. R. 7-3.03.5.6
Miss. Code Ann. § 75-49-5 (Supp. 2013).