The following tasks have a maximum cost as listed in items A to D when one of these technologies is used: hollow-stem auger, mud or air rotary, air coring, or rotosonic, or when the tasks are necessary for well sealing:
A. mobilization/demobilization (drilling) (0 to 50 miles one way), $484;B. mobilization/demobilization (drilling) (51 to 500 miles one way), $484 plus $8 per mile over 50 miles;C. mobilization/demobilization (drilling) (over 500 miles one way), $3,751; andD. per diem, $164 per day per person.Minn. R. agency 120, ch. 2890, pt. 2890.3700
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)Statutory Authority: MS s 115C.07