With respect to certain types of projects, the Act requires the Authority to make additional determinations. Those projects include major business expansion projects, relocation of certain facilities, recycling and waste reduction projects, paper industry job retention projects, transmission facilities projects, pollution control facilities, energy generating system projects, energy distribution system projects and certain hydroelectric facilities. In these cases, the application must provide such information as the Authority may reasonably require as a basis for such determinations.
94- 457 C.M.R. ch. 202, § 3