In extenuating and emergency circumstances, the Board may extend the twelve-month period within which basic training is required for a period of time up to that allowed by statute.
16- 227 C.M.R. ch. 9, § 2
In extenuating and emergency circumstances, the Board may extend the twelve-month period within which basic training is required for a period of time up to that allowed by statute.
16- 227 C.M.R. ch. 9, § 2