Pursuant to 25 M.R.S.A. §2804-C and in extenuating and emergency circumstances, the Board may extend the twelve-month period within which basic training is required for a period of time up to that allowed by statute.
16- 227 C.M.R. ch. 9, § 1
Pursuant to 25 M.R.S.A. §2804-C and in extenuating and emergency circumstances, the Board may extend the twelve-month period within which basic training is required for a period of time up to that allowed by statute.
16- 227 C.M.R. ch. 9, § 1