Current through Register Vol. 50, No. 11, November 20, 2024
Section VII-1119 - Audit of Dairy Plants that Operate under the HACCP Systems Defined in this PartA. Procedures that shall be used by the state health officer in the audit of dairy plants which are required to implement HACCP Systems: 1. conduct a pre-audit management interview during which he shall review and discuss the plant HACCP system including: a. changes in management structure;b. the hazard analysis - ensure that all food hazards are addressed;c. changes in the HACCP plan;d. changes in the prerequisite programs (PPs);e. changes in the flow diagrams; andf. changes in products or process;2. review past audit reports and correction of deficiencies;3. perform a comprehensive in-plant review of the facilities, equipment, operations and implementation of the HACCP system;4. review records of the implementation of the plant's HACCP system;5. review the plant's compliance with other applicable requirements of this Part including: a. raw milk supply source;f. regulatory sample compliance; andg. pasteurization equipment design, construction and operation;6. conduct an exit interview with plant management and the plant HACCP team, which includes: a. discussing the findings and observations;b. establishing time lines for the correction of all identified deficiencies and non conformities; andc. preparing and issuing the audit report;7. take appropriate action to verify that all deficiencies have been corrected within the established time frame as soon as practical after the established time or date;8. take immediate action when an imminent health hazard is observed to prevent further movement of products until such hazards have been eliminated;9. initiate regulatory enforcement such as permit suspension, revocation or other equivalent measures when the dairy plant has failed to recognize or correct a deficiency or non conformity;10. critical listing elements. It is essential that each regulatory audit includes a thorough review of each of the critical listing elements of the plant's HACCP System; a. Deficiencies or non conformities related to Critical Listing Elements require immediate attention and constitute grounds for suspension of the permit;b. The following are critical listing elements: i. hazard analysis - flow diagram and a hazard analysis has been conducted and written for each kind or group of dairy products, including frozen desserts, which are processed;ii. HACCP plan - a written HACCP plan prepared for each kind or group of dairy products, including frozen desserts, which are processed;iii. HACCP plan - critical limits (CL) are adequate to control the hazard identified.iv. HACCP plan - corrective action taken for products produced during a deviation from the critical limits defined in the plan;v. HACCP plan - verification and validation - calibration of CCP process monitoring instruments and equipment was performed as required and at the frequency defined in the plan;vi. HACCP system records - information on HACCP records were not falsified;vii. Other NCIMS requirements - in coming milk supply from NCIMS listed source(s) with sanitation scores of 90 or better or acceptable HACCP Listing;viii. other NCIMS requirements - drug residue control program implemented; and,ix. HACCP system audit findings - follow up action - no major HACCP system dysfunction exists, but if a series of observations made during an audit indicate that a plant does not have sufficient control of its HACCP system or operations to prevent a compromise to food safety, this shall constitute grounds for immediate suspension of permit.La. Admin. Code tit. 51, § VII-1119
Promulgated by the Department of Health and HospLR 28:1277 (June 2002), amended LR 37:2691 (September 2011).AUTHORITY NOTE: Promulgated in accordance with the provisions of R.S. 40:4(A)(1)(a). Also see R.S. 40:5(2)(3)(5)(7)(15)(17) and R.S. 40:922.