La. Admin. Code tit. 43 § XI-4703

Current through Register Vol. 50, No. 11, November 20, 2024
Section XI-4703 - General Requirements (Formerly section 1703)
A. Each new pipeline system, each pipeline system in which pipe has been relocated or replaced, or that part of a pipeline system that has been relocated or replaced, must be hydrostatically tested in accordance with this Chapter without leakage.
B. The test pressure for each hydrostatic test conducted under this Section must be maintained throughout the system, or the part being tested, for at least four continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually inspected for leakage during test, for at least an additional four continuous hours at a pressure equal to 110 percent, or more, of the maximum operating pressure.

La. Admin. Code tit. 43, § XI-4703

Promulgated by the Department of Natural Resources, Office of Conservation, LR 12:115 (February 1986), repromulgated LR 49316 (2/1/2023).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:4(C)(17) and R.S. 30:1104(A).