Section XI-4543 - Cover over Buried Pipeline (Formerly section 1543)A. Unless specifically exempted in this Chapter, all pipe must be buried so that it is below the level of cultivation. Except as provided in Subsection B of this Section, the pipe must be installed so that the cover between the top of the pipe and the ground level, road bed, river bottom, or sea bottom, as applicable, complies with the following table. Location | Cover (Inches) |
For Normal Excavation | For Rock Excavation1 |
Industrial, commercial, and residential areas | 36 | 30 |
Crossings of inland bodies of water with a width of at least 100 feet from high water mark to high water mark | 48 | 18 |
Drainage ditches at public roads and railroads | 36 | 36 |
Deepwater port safety zone | 48 | 24 |
Other offshore areas under water less than 20 feet deep as measured from the mean low tide | 30 | 18 |
Any other area | 30 | 18 |
1Rock excavation is any excavation that requires blasting or removal by equivalent means.
B. Less cover than the minimum required by Subsection A of this Section and §4511 may be used if:1. it is impractical to comply with the minimum cover requirements; and2. additional protection is provided that is equivalent to the minimum required cover.La. Admin. Code tit. 43, § XI-4543
Promulgated by the Department of Natural Resources, Office of Conservation, LR 12:115 (February 1986), repromulgated LR 49315 (2/1/2023).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:4(C)(17) and R.S. 30:1104(A).