675 Ind. Admin. Code 15-1.6-3

Current through December 4, 2024
Section 675 IAC 15-1.6-3 - Penalty fees

Authority: IC 22-12-6-1; IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2

Affected: IC 22-12; IC 22-13; IC 22-15

Sec. 3.

(a) In accordance with 675 IAC 15-1.2-3, it shall be unlawful for production of an industrialized building system or mobile structure to begin without first obtaining a construction design release.
(b) The following fees are applicable if production is started before the issuance of a design release:

(1) System plan review, including structural/typical systems:
(A) filing fee $60
(B) residential, add-a-room, or duplex $6403
(C) commercial $1,0103,4
(2) Addenda, including structural/typical systems:
(A) filing fee $60
(B) residential, add-a-room, or duplex $1703
(C) commercial $210 3,4

Notes:

3Includes only the original floor plan. A one hundred dollar ($100) fee is charged for each additional floor plan. Crawlspace or basement plans are considered a floor plan.

4Includes two (2) units as a completed structure. A one hundred dollar ($100) fee is charged for each additional module unit.

675 IAC 15-1.6-3

Fire Prevention and Building Safety Commission; 675 IAC 15-1.6-3; filed Aug 18, 2005, 4:30 p.m.: 29 IR 27; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFA
Readopted filed 3/10/2017, 9:37 a.m.: 20170405-IR-675170005RFA
Readopted filed 5/11/2023, 2:22 p.m.: 20230607-IR-675230104RFA