675 Ind. Admin. Code 15-1.5-6

Current through December 4, 2024
Section 675 IAC 15-1.5-6 - Third party inspection agency; renewal of authorization

Authority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2; IC 22-15-4-3

Affected: IC 22-12; IC 22-13; IC 22-15

Sec. 6.

(a) An application for renewal for a third party inspection agency shall be filed with the office of the state building commissioner thirty (30) days before the expiration of authorization.
(b) A renewal application shall be filed in accordance with section 2 of this rule.
(c) If there are no changes to the original application submitted as set out in section 2 of this rule, the third party inspection agency shall be required to submit a letter requesting a renewal.
(d) Fees for a renewal shall be paid in accordance with 675 IAC 15-1.6.
(e) If the third party inspection agency fails to renew their authorization, the third party inspection agency may no longer perform in-plant inspections or certify industrialized building systems or mobile structures.

675 IAC 15-1.5-6

Fire Prevention and Building Safety Commission; 675 IAC 15-1.5-6; filed Aug 18, 2005, 4:30 p.m.: 29 IR 26; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFA
Readopted filed 3/10/2017, 9:37 a.m.: 20170405-IR-675170005RFA
Readopted filed 5/11/2023, 2:22 p.m.: 20230607-IR-675230104RFA