Current through December 4, 2024
Section 675 IAC 15-1.4-7 - Quality control programAuthority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2
Affected: IC 22-12; IC 22-13; IC 22-15
Sec. 7.
(a) The manufacturer shall develop and implement a quality control program for industrialized building systems or mobile structures that are to be certified by 675 IAC 15-1.1 through 675 IAC 15-1.3, this rule, and 675 IAC 15-1.5 through 675 IAC 15-1.7.(b) As part of the quality control program, a quality control manual shall be required for each manufacturing facility that will participate in the certification program of uncertified industrialized building systems or mobile structures. The manual shall outline the manufacturer's program for quality control and compliance assurance within each manufacturing facility that participates, including, but not limited to, the following: (1) A location map for the manufacturing facility.(2) A general facility layout diagram indicating where the dismantling will be performed. (3) A general description of the various stations or areas where quality control will be performed.(4) A general description of the in-plant procedures of quality control, including who is performing the quality control and how routine quality control is performed.(5) A general description of testing and equipment used to perform tests in areas, such as plumbing and electrical, to assure compliance with the released construction documents and the applicable rules of the commission.(6) A sample data plate as described in section 7 of this rule.(7) A statement certifying that an Indiana seal of acceptance issued by the office of the state building commissioner will not be attached to an industrialized building system or mobile structure that does not comply with the requirements of 675 IAC 15-1.1 through 675 IAC 15-1.3, this rule, and 675 IAC 15-1.5 through 675 IAC 15-1.7 or the applicable rules of the commission.(c) The quality control manual shall be submitted for review and released in accordance with 675 IAC 15-1.2-3.(d) Any revisions to the quality control manual shall be submitted for review and released in accordance with 675 IAC 15-1.2-11.(e) The manufacturer shall implement the released quality control program.Fire Prevention and Building Safety Commission; 675 IAC 15-1.4-7; filed Aug 18, 2005, 4:30 p.m.: 29 IR 24; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFAReadopted filed 3/10/2017, 9:37 a.m.: 20170405-IR-675170005RFAReadopted filed 5/11/2023, 2:22 p.m.: 20230607-IR-675230104RFA