Current through December 4, 2024
Section 675 IAC 15-1.4-6 - In-plant inspection; requiredAuthority: IC 22-13-2-2; IC 22-13-2-13; IC 22-13-4-2
Affected: IC 22-12; IC 22-13; IC 22-15
Sec. 6.
(a) An in-plant inspection shall be preformed [sic., performed] at the manufacturing facility. Personnel from the office of the state building commissioners office shall perform the in-plant inspection.(b) The industrialized building system or mobile structure shall be partially dismantled to readily allow inspection of the following: (1) Exterior wall construction. (2) Interior load-bearing wall construction.(3) Roof/ceiling construction.(5) Electrical service panel wall area. (6) Plumbing, including water distribution, draining, waste, and venting.(c) The manufacturer shall pay the fees as required by 675 IAC 15-1.6.Fire Prevention and Building Safety Commission; 675 IAC 15-1.4-6; filed Aug 18, 2005, 4:30 p.m.: 29 IR 24; readopted filed Aug 4, 2011, 8:35 a.m.: 20110831-IR-675110254RFAReadopted filed 3/10/2017, 9:37 a.m.: 20170405-IR-675170005RFAReadopted filed 5/11/2023, 2:22 p.m.: 20230607-IR-675230104RFA