329 Ind. Admin. Code 11-5-5

Current through December 4, 2024
Section 329 IAC 11-5-5 - Renewal of permit by existing permittee

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 5.

(a) To continue operation, facilities affected by this rule must submit an application for renewal under 329 IAC 11-9, 329 IAC 11-10, and 329 IAC 11-11 at least one hundred twenty (120) days prior to the expiration of their operating permit.
(b) The renewal permit issued to a facility affected by this rule must identify the site classification as established in 329 IAC 11-8 to reflect the restrictions on waste accepted at the facility under the existing permit.
(c) The operational standards of 329 IAC 11-13, 329 IAC 11-14, and 329 IAC 11-15 for solid waste processing facilities must apply to solid waste processing facilities with renewal permits issued under this article.

329 IAC 11-5-5

Solid Waste Management Board; 329 IAC 11-5-5; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1935; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA; readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA
Readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA