Authority: IC 13-1-1-4; IC 13-7-7
Affected: IC 13-1-1; IC 13-7
Sec. 4.
The following sources and facilities located in Wayne County shall comply with the sulfur dioxide emission limitations in pounds per million Btu, unless otherwise specified, and other requirements:
Source | Facility Description | Emission Limitations |
(1) Belden Corp. | Boilers 3,4,5,6 (oil) (common stack) | 1.6 |
(2) Earlham | Boilers 1 & 2 (oil/gas) | 1.6 |
College | (common stack) | |
(3) Johns-Manville Co. | Boiler B-2 (oil/gas) | 1.6 |
Glass Furnaces SX- | 9 pounds | |
2,SX-3 (common stack) | per ton | |
(4) Joseph Hill | Boilers 1,2,4 (oil) | 1.6 |
(Plant A) | (common stack) | |
Boiler 3 (oil) | 1.6 | |
(5) Joseph Hill | Boilers 1,2,3 (oil/gas) | 0.3 |
(Plant B) | (common stack) | |
(6) Kemper | Boiler 1 (coal) | 2.3 |
Boiler 2 (wood/coal) | 2.1 | |
Boiler 3 (wood/sawdust) | 1.2 |
Kemper Boilers 1 and 2 also shall be limited to one and three-tenths (1.3) pounds per million Btu, and Boiler 3 also shall be limited to one and two-tenths (1.2) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period.
NATCO Boiler 1 also shall be limited to three and seven-tenths (3.7) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period.
Purina Co. common stack)
Power and Light (common stack) (RP&L)
RP&L shall construct a new good engineering practice stack with height of at least three hundred twenty-five (325) feet above grade by July 31, 1988.
State Hospital (common stack)
Boiler 2 (coal) 4.9
Sanyo E&E Boilers 1 and 2 also shall be limited to three and nine-tenths (3.9) pounds per million Btu based on the annual average sulfur content of the fuel over any twelve (12) consecutive month period.
326 IAC 7-4-4