Authority: IC 13-14-8; IC 13-17-3
Affected: IC 13-15; IC 13-17
Sec. 3.1.
Source | Emission Unit Description | Emission Limit (lbs/hour) or Other Requirements | Emission Limit (lbs/MMBtu) |
(1) Wabash River Combined Cycle Source ID No. 00147 | Combustion Turbine Unit 1A | 333.76 | 0.195 |
(2) sgSolutions Source ID No. 00091 | (A) Tail Gas Incinerator Stack EP1 (B) Process Flare Unit 2 | 230.6 500 hour calendar year operating limit on coal/syngas | |
(3) SONY Digital Audio Disc | (A) #1 Kewanee Boiler | 0.05 | |
Source ID No. 00032 | (B) #2 Kewanee Boiler | 0.05 | |
(C) Unit 3 Burnham Boiler | 0.05 | ||
(D) Unit 4 Burnham Boiler | 0.05 | ||
(E) Unit 5 Superior Boiler | 0.05 | ||
(F) Unit 6 Superior Boiler | 0.05 | ||
(G) Unit 18 Boiler | 0.05 | ||
(4) Taghleef Industries Source | (A) Clayton Boiler (Standby) | 0.03 | 0.0015 |
ID No. 00045 | (B) Nebraska Boiler | 0.05 | 0.0015 |
(C) Nebraska-D Boiler | Burn natural gas | ||
(5) Terre Haute Regional | (A) #1 Boiler | 0.45 | |
Hospital Source ID No. 00046 | (B) New #2 Boiler | 0.45 | |
(6) Union Hospital Source ID | 2 Keeler Boilers | 0.36 | |
No. 00047 | |||
(7) Duke Energy - Wabash | (A) Boiler 6 | 1,499.5 | 0.5 |
River Generating Station Source ID No. 00021 | (B) Diesel Generators 7A, 7B, and 7C | 500 hour calendar year operating limit (each) | 0.05 |
326 IAC 7-4-3.1