312 Ind. Admin. Code 29-2-34

Current through December 4, 2024
Section 312 IAC 29-2-34 - "Concrete production fluid storage structure" defined

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 34.

"Concrete production fluid storage structure" means a formed concrete impoundment, the base of which is at or below ground level, which is or has been used for the temporary storage of liquid oilfield waste or produced water prior to disposal.

312 IAC 29-2-34

Natural Resources Commission; 312 IAC 29-2-34; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA
Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA