Current through December 4, 2024
Section 312 IAC 29-13-2 - Exemption from drilling unit and well spacing requirementsAuthority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 2.
The following wells may be exempt from the drilling unit and well spacing requirements in accordance with section 7 of this rule:
(1) Noncommercial wells, except that a noncommercial well shall not be located such that it would cause an existing commercial gas or coal bed methane well to be in violation of the spacing requirements of this rule.(2) Coal bed methane wells completed in any of the following: (A) A void created by mining out a coal seam.(B) A pillar inside a mined out area of an abandoned underground coal mine.(C) Gob created by longwall or other methods of coal extraction.(5) Gas storage observation wells.(6) Petroleum storage wells.(8) Geological or structure test wells.Natural Resources Commission; 312 IAC 29-13-2; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRAReadopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA