Section 312 IAC 25-6-44 - Coal processing waste; dams and embankments; site preparationAuthority: IC 14-34-2-1
Affected: IC 14-34
Sec. 44.
The following requirements apply before coal processing waste is placed at a dam or embankment site:
(1) All trees, shrubs, grasses, and other organic material shall be cleared and grubbed from the site, and all combustibles shall be removed and stockpiled in accordance with sections 5 through 43 of this rule, this section, and sections 45 through 68 of this rule.(2) Surface drainage that may cause erosion to the embankment area or the embankment features, whether during construction or after completion, shall be diverted away from the embankment by diversion ditches that comply with section 14 of this rule. Adequate outlets for discharge from these diversions shall be in accordance with section 18 of this rule. Diversions that are designed to divert drainage from the upstream area away from the impoundment area shall be designed to protect public health and safety and the environment. The diversion shall be maintained to prevent blockage, and the discharge shall be in accordance with section 18 of this rule. Sediment control measures shall be provided at the discharge of each diversion ditch before entry into natural watercourses in accordance with sections 12 through 17 of this rule.Natural Resources Commission; 312 IAC 25-6-44; filed Jun 21, 2001, 2:53 p.m.: 24 IR 3532, eff Dec 1, 2001; errata filed Nov 20, 2001, 11:55 a.m.: 25 IR 1182; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFAReadopted filed 3/26/2019, 3:40 p.m.: 20190424-IR-312190011RFA