Browse as ListSearch Within- Section 312 IAC 25-6-1 - Coal exploration; applicability
- Section 312 IAC 25-6-2 - Coal exploration; required documents
- Section 312 IAC 25-6-3 - Coal exploration; performance standards
- Section 312 IAC 25-6-4 - Coal exploration; permit requirements
- Section 312 IAC 25-6-5 - Surface mining; applicability
- Section 312 IAC 25-6-6 - Surface mining; signs and markers
- Section 312 IAC 25-6-7 - Surface mining; coal recovery
- Section 312 IAC 25-6-8 - Surface mining; casing and sealing drilled holes; general requirements
- Section 312 IAC 25-6-9 - Surface mining; casing and sealing drilled holes; temporary
- Section 312 IAC 25-6-10 - Surface mining; casing and sealing drilled holes; permanent
- Section 312 IAC 25-6-11 - Surface mining; topsoil and subsoil
- Section 312 IAC 25-6-12 - Hydrologic balance; general requirements
- Section 312 IAC 25-6-12.5 - Hydrologic balance; application of ground water quality standards at surface coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, including augering, coal processing, coal processing waste disposal, or spoil deposition, occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
- Section 312 IAC 25-6-13 - Surface mining; hydrologic balance; water quality standards and effluent limitations
- Section 312 IAC 25-6-14 - Hydrologic balance; diversion; general requirements
- Section 312 IAC 25-6-15 - Hydrologic balance; diversions of perennial streams, intermittent streams, miscellaneous flows; supplemental requirements
- Section 312 IAC 25-6-16 - Surface mining; hydrologic balance; sediment control measures
- Section 312 IAC 25-6-17 - Surface mining; hydrologic balance; siltation structures
- Section 312 IAC 25-6-18 - Hydrologic balance; discharge structures
- Section 312 IAC 25-6-19 - Hydrologic balance; acid-forming and toxic-forming spoil
- Section 312 IAC 25-6-20 - Surface mining; hydrologic balance; permanent and temporary impoundments
- Section 312 IAC 25-6-21 - Hydrologic balance; ground water protection
- Section 312 IAC 25-6-22 - Hydrologic balance; ground water recharge capacity protection
- Section 312 IAC 25-6-23 - Surface mining; hydrologic balance; surface and ground water monitoring
- Section 312 IAC 25-6-24 - Hydrologic balance; transfer of wells
- Section 312 IAC 25-6-25 - Hydrologic balance; water rights and replacement
- Section 312 IAC 25-6-26 - Hydrologic balance; water discharge into underground mine
- Section 312 IAC 25-6-27 - Surface mining; hydrologic balance; siltation structures postmining rehabilitation; diversions, impoundments, and treatment facilities
- Section 312 IAC 25-6-28 - Surface mining; hydrologic balance; stream buffer zone
- Section 312 IAC 25-6-29 - Surface mining; explosives; general requirements
- Section 312 IAC 25-6-30 - Surface mining; explosives; preblasting survey
- Section 312 IAC 25-6-31 - Surface mining; explosives; publication of blasting schedule
- Section 312 IAC 25-6-32 - Surface mining; explosives; blasting operations
- Section 312 IAC 25-6-33 - Surface mining; explosives; records of blasting operations
- Section 312 IAC 25-6-34 - Surface mining; disposal of excess spoil
- Section 312 IAC 25-6-35 - Surface mining; protection of underground mines
- Section 312 IAC 25-6-36 - Surface mining; coal mine waste; general requirements
- Section 312 IAC 25-6-37 - Surface mining; coal mine waste; refuse piles; site inspection
- Section 312 IAC 25-6-38 - Coal processing waste; refuse piles; water control measures
- Section 312 IAC 25-6-39 - Surface mining; coal mine waste; refuse piles; construction requirements
- Section 312 IAC 25-6-40 - Coal processing waste; burning
- Section 312 IAC 25-6-41 - Coal processing waste; return to underground workings
- Section 312 IAC 25-6-42 - Disposal of noncoal wastes
- Section 312 IAC 25-6-43 - Surface mining; coal mine waste; dams and embankments; general requirements
- Section 312 IAC 25-6-44 - Coal processing waste; dams and embankments; site preparation
- Section 312 IAC 25-6-45 - Surface mining; coal mine waste; dams and embankments; design and construction
- Section 312 IAC 25-6-46 - Surface mining; protection of fish, wildlife, and related environmental values
- Section 312 IAC 25-6-47 - Surface mining; slides and other damage
- Section 312 IAC 25-6-48 - Surface mining; contemporaneous reclamation
- Section 312 IAC 25-6-49 - Surface mining; backfilling and grading; timing limitations
- Section 312 IAC 25-6-50 - Surface mining; backfilling and grading; general requirements
- Section 312 IAC 25-6-51 - Surface mining; stabilization of surface areas
- Section 312 IAC 25-6-52 - Surface mining; backfilling and grading; thick overburden
- Section 312 IAC 25-6-53 - Surface mining; backfilling and grading; previously mined areas
- Section 312 IAC 25-6-54 - Surface mining; revegetation; general requirements
- Section 312 IAC 25-6-55 - Surface mining; revegetation; use of introduced species
- Section 312 IAC 25-6-56 - Surface mining; revegetation; timing
- Section 312 IAC 25-6-57 - Surface mining; revegetation; mulching and other soil stabilizing practices
- Section 312 IAC 25-6-58 - Surface mining; revegetation; grazing
- Section 312 IAC 25-6-59 - Surface mining; revegetation; standards for success for nonprime farmland
- Section 312 IAC 25-6-60 - Revegetation; sampling techniques for nonprime farmland
- Section 312 IAC 25-6-61 - Revegetation; statistical methodology
- Section 312 IAC 25-6-62 - Cessation of operations; temporary
- Section 312 IAC 25-6-63 - Cessation of operations; permanent
- Section 312 IAC 25-6-64 - Postmining land use
- Section 312 IAC 25-6-65 - Surface mining; roads
- Section 312 IAC 25-6-66 - Surface mining; primary roads
- Section 312 IAC 25-6-67 - Surface mining; other transportation facilities
- Section 312 IAC 25-6-68 - Support facilities and utility installations
- Section 312 IAC 25-6-69 - Surveyor corner markers; replacement
- Section 312 IAC 25-6-70 - Underground mining; applicability
- Section 312 IAC 25-6-71 - Underground mining; signs and markers
- Section 312 IAC 25-6-72 - Underground mining; casing and sealing exposed underground openings; general requirements
- Section 312 IAC 25-6-73 - Underground mining; casing and sealing exposed underground openings; temporary
- Section 312 IAC 25-6-74 - Underground mining; casing and sealing exposed underground openings; permanent
- Section 312 IAC 25-6-75 - Underground mining; topsoil and subsoil
- Section 312 IAC 25-6-76 - Underground mining; hydrologic balance; general requirements
- Section 312 IAC 25-6-76.5 - Underground mining; hydrologic balance; application of ground water quality standards at underground coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, coal processing, coal processing waste disposal, or underground development waste and spoil deposition occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
- Section 312 IAC 25-6-77 - Underground mining; hydrologic balance; water quality standards and effluent limitations
- Section 312 IAC 25-6-78 - Underground mining; hydrologic balance; diversions; general requirements
- Section 312 IAC 25-6-79 - Underground mining; hydrologic balance; diversions of perennial streams, intermittent streams with a watershed greater than one square mile, miscellaneous flows; stream channel diversions; supplemental requirements
- Section 312 IAC 25-6-80 - Underground mining; hydrologic balance; sediment control measures
- Section 312 IAC 25-6-81 - Underground mining; hydrologic balance; siltation structures
- Section 312 IAC 25-6-82 - Underground mining; hydrologic balance; discharge structures
- Section 312 IAC 25-6-83 - Underground mining; hydrologic balance; acid-forming and toxic-forming materials
- Section 312 IAC 25-6-84 - Underground mining; hydrologic balance; permanent and temporary impoundments
- Section 312 IAC 25-6-85 - Underground mining; hydrologic balance; underground mine entry and access discharges
- Section 312 IAC 25-6-86 - Underground mining; hydrologic balance; surface and ground water monitoring
- Section 312 IAC 25-6-87 - Underground mining; hydrologic balance; transfer of wells
- Section 312 IAC 25-6-88 - Underground mining; hydrologic balance; water rights and replacement
- Section 312 IAC 25-6-89 - Underground mining; hydrologic balance; discharge of water into underground mine
- Section 312 IAC 25-6-90 - Underground mining; hydrologic balance; postmining rehabilitation of siltation structures, diversions, impoundments, and treatment facilities
- Section 312 IAC 25-6-91 - Underground mining; hydrologic balance; stream buffer zones
- Section 312 IAC 25-6-92 - Underground mining; coal recovery
- Section 312 IAC 25-6-93 - Underground mining; explosives; general requirements
- Section 312 IAC 25-6-94 - Underground mining; explosives; preblasting survey
- Section 312 IAC 25-6-95 - Underground mining; explosives; publication of blasting schedule
- Section 312 IAC 25-6-96 - Underground mining; explosives; surface blasting operations
- Section 312 IAC 25-6-97 - Underground mining; explosives; records of blasting operations
- Section 312 IAC 25-6-98 - Underground mining; disposal of underground development waste and excess spoil
- Section 312 IAC 25-6-99 - Underground mining; coal mine waste; general requirements
- Section 312 IAC 25-6-100 - Underground mining; coal mine waste; refuse piles; site inspection
- Section 312 IAC 25-6-101 - Underground mining; coal mine waste banks; refuse piles; water control measures
- Section 312 IAC 25-6-102 - Underground mining; coal mine waste; refuse piles; construction requirements
- Section 312 IAC 25-6-103 - Underground mining; coal processing waste; burning
- Section 312 IAC 25-6-104 - Underground mining; coal processing waste; return to underground workings
- Section 312 IAC 25-6-105 - Underground mining; disposal of noncoal wastes
- Section 312 IAC 25-6-106 - Underground mining; coal mine waste; refuse piles; dams and embankments; general requirements
- Section 312 IAC 25-6-107 - Underground mining; coal processing waste; dams and embankments; site preparation
- Section 312 IAC 25-6-108 - Underground mining; coal mine waste; refuse piles; dams and embankments; design and construction
- Section 312 IAC 25-6-109 - Underground mining; protection of fish, wildlife, and related environmental values
- Section 312 IAC 25-6-110 - Underground mining; slides and other damage
- Section 312 IAC 25-6-111 - Underground mining; contemporaneous reclamation
- Section 312 IAC 25-6-112 - Underground mining; backfilling and grading; general requirements
- Section 312 IAC 25-6-113 - Underground mining; stabilization of surface areas
- Section 312 IAC 25-6-114 - Underground mining; backfilling and grading; previously mined areas
- Section 312 IAC 25-6-115 - Underground mining; revegetation; general requirements
- Section 312 IAC 25-6-116 - Underground mining; revegetation; use of introduced species
- Section 312 IAC 25-6-117 - Underground mining; revegetation; timing
- Section 312 IAC 25-6-118 - Underground mining; revegetation; mulching and soil stabilizing
- Section 312 IAC 25-6-119 - Underground mining; revegetation; grazing
- Section 312 IAC 25-6-120 - Underground mining; revegetation; standards for success for nonprime farmland
- Section 312 IAC 25-6-121 - Underground mining; revegetation; sampling techniques
- Section 312 IAC 25-6-122 - Underground mining; revegetation; statistical methodology
- Section 312 IAC 25-6-123 - Underground mining; subsidence control; general requirements
- Section 312 IAC 25-6-124 - Underground mining; subsidence control; public notice
- Section 312 IAC 25-6-125 - Underground mining; subsidence control; buffer zones
- Section 312 IAC 25-6-126 - Underground mining; cessation of operation; temporary
- Section 312 IAC 25-6-127 - Underground mining; cessation of operation; permanent
- Section 312 IAC 25-6-128 - Underground mining; postmining land use
- Section 312 IAC 25-6-129 - Underground mining; roads
- Section 312 IAC 25-6-130 - Underground mining; primary roads
- Section 312 IAC 25-6-131 - Underground mining; other transportation facilities
- Section 312 IAC 25-6-132 - Underground mining; support facilities and utility installations
- Section 312 IAC 25-6-133 - Underground mining; surveyor corner markers; replacement
- Section 312 IAC 25-6-134 - Concurrent surface and underground mining; applicability
- Section 312 IAC 25-6-135 - Concurrent surface and underground mining; compliance with variance terms
- Section 312 IAC 25-6-136 - Concurrent surface and underground mining; additional performance standards
- Section 312 IAC 25-6-137 - Auger mining; special standards; applicability
- Section 312 IAC 25-6-138 - Auger mining; special standards; additional performance standards
- Section 312 IAC 25-6-139 - Prime farmland; special performance standards; scope, purpose, and applicability
- Section 312 IAC 25-6-140 - Prime farmland; special performance standards; United States Soil Conservation Service criteria
- Section 312 IAC 25-6-141 - Prime farmland; special performance standards; soil removal and stockpiling
- Section 312 IAC 25-6-142 - Prime farmland; special performance standards; soil replacement
- Section 312 IAC 25-6-143 - Prime farmland; special performance standards; revegetation and restoration of soil productivity
- Section 312 IAC 25-6-144 - Steep slopes; backfilling and grading
- Section 312 IAC 25-6-145 - Coal preparation plants not within permit area for a mine; permits; applicability
- Section 312 IAC 25-6-146 - Coal preparation plants not within a permit area for a mine; special performance standards
- Section 312 IAC 25-6-147 - In situ processing; special performance standards
- Section 312 IAC 25-6-148 - In situ processing; monitoring
- Section 312 IAC 25-6-149 - Annual report