Authority: IC 14-34-2-1
Affected: IC 14-34
Sec. 18.
Discharge from siltation structures, permanent and temporary impoundments, coal processing waste dams and embankments, and diversions shall be controlled, by energy dissipators, riprap channels, and other devices, where necessary, to do the following:
Discharge structures shall be designed according to standard engineering design procedures.
312 IAC 25-6-18