Current through December 4, 2024
Section 312 IAC 25-4-82 - Underground mining permit applications; operation plan; existing structuresAuthority: IC 14-34-2-1
Affected: IC 14-34
Sec. 82.
(a) Each application shall contain a description of each existing structure proposed to be used in connection with or to facilitate the surface coal mining and reclamation operation. The description shall include the following: (2) Plans of the structures that describe its current condition.(b) Structures in existence prior to the implementation of this permanent program under IC 14-34 shall meet the performance standards of 312 IAC 25-6-5 through 312 IAC 25-6-133; however, when the operator demonstrates in the application for a permit that immediate compliance is not practicable, the director may approve a schedule for modification of existing structures that achieves compliance with 312 IAC 25-6-5 through 312 IAC 25-6-133 within a reasonable period of time.Natural Resources Commission; 312 IAC 25-4-82; filed Jun 21, 2001, 2:53 p.m.: 24 IR 3471, eff Dec 1, 2001; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFAReadopted filed 3/26/2019, 3:40 p.m.: 20190424-IR-312190011RFA