Current through October 31, 2024
Section 25 IAC 2-7-3 - Conditional acceptance of bid; work load of bidder exceeding prequalification rating (Repealed)Repealed by Indiana Department of Administration; Public Works Division; filed Feb 3, 1982, 1:05 pm: 5 IR 523