Authority: IC 4-13-2-9; IC 4-13.6-3-1
Affected: IC 4-13.6-1-15; IC 5-16-1-1.1; IC 36-1-12
Sec. 2.
A bid may only be awarded to a responsible contractor. Factors to be used in making a responsibility determination are quality of material, experience, efficiency, and reputation of the bidder, the character, integrity, credit, and conscientiousness of the bidder, the ability of the bidder to respond and answer in accordance with what is expected or demanded and to fulfill letter and spirit the contract made with him, the accessibility of the bidder, and any other factor that the commissioner determines to affect responsibility as defined in IC 4-13.6-1-15.
25 IAC 2-7-2